Getting intital permits

getting intital permits
for your project

revealing hidden design risks
excluding the failure to obtain a construction permit
clearly determine the time schedule and budget of a project

Each facility helps our partners solve their business challanges: to become stronger than competitors and take the leadership position, to capture or retain the market, to make a profit. You already know what kind of facility you need (factory, warehouse, trade center or other), its main parameters and location.

However, you need to solve the key issues that affect the time schedule and budget of the project:

What is allowed and what is prohibited to build on the selected site?
How to connect the constructed facility to the utilities?
What is the total usable area of the site?
What are the restrictions on architectural solutions and floors' number?

To minimize design risks, exclude the failure to obtain the construction permit and clearly define the time schedule and budget of the project it is necessary to prepare the initial permitting documentation with due diligence.

The rules for preparing Initial permits vary in diffenent constituent entities of the Russian Federation. In addition, issues related to urban planning activities are under the simultaneous control of both federal and regional and municipal authorities. As a consequence, there is no unified procedure for preparing Initial permits and their exhaustive list. You have to know well the regulations and practices of state and municipal services to prepare and get the approval of Initial permits promptly, and be able to prepare the documents in accordance with the frequently changing rules and regulations. Only the most experienced companies can perform this task quickly and to the fullest extent.

PSO-13 will carry out the necessary surveys and complete initial documents package that fully satisfies the established requirements
Specify
terms of reference
for construction

We find out if construction is allowed on the Client's land plot and existing restrictions.

We collect the necessary data about the land plot: documents of title, cadastral plan, confirmation of the type of permitted use.

Define landplot
parameters

We prepare reports of the standard form on the results of engineering surveys impacting the building's structure (geodetic, geological, ecological, hydrological). If necessary, we carry out preliminary topographic survey and geological boring.

Provide
connection to
utility networks

Get Technical Specifications (TS) for connection to water, gas, electricity and heat supply, storm and domestic sewerage networks, telephone networks and data transmission, for garbage removal and the junctions to the road networks.

Define
the area of sanitation
protective zones

Obtain permits from regulatory and supervisory authorities: acts and permits impacting the parameters of sanitary protection zones. as well as certificates, approvals and conclusions of authorized supervisory bodies and other organizations required for the preparation and expertise of design documentation.

identify the architectural
and planning
restrictions

Determine the allowable number of floors and the building site area. For this purpose we prepare and draw up urban planning documentation: urban feasibility study, architectural and urban design, urban development plan of the landplot.

Result

  • Awareness of all significant circumstances affecting the budget and time schedule of the project.
  • Full package of Initial documents that meets all legal requirements.
  • Accelerated commencement of construction and installation works.
Are you holding a tender?
Send the application or call us
We will quickly provide a package of documents for accreditation and a site visit to any facility that is under construction or has been built by us. We will thoroughly study your Terms of reference and prepare a detailed BoQ with a breakdown of cost and works scope, materials and equipment as soon as possible.